Millwork calculator

Running feet of base, casing and crown, with the stick count for a real order.

Millwork

Running feet of base, casing and crown, with the stick count for a real order.

ft
ft
WASTE
WHAT TO ORDERMillwork
Run length340 linear ft
Length to buy374 linear ft
16 ft sticks24 sticks
Finish nails, 2½ in24 boxes
Caulk and filler4 tubes

Mitres eat the offcuts. Ten per cent covers a normal house; fifteen if the rooms are small.

MATERIAL COST10% WASTE

$468

374.0 linear ft of primed mdf base at $1.25 / linear ft

Primed MDF base$468
Waste share, 10%$43
All-in per linear ft$1.25

Free. No signup. The quantities carry over as line items.

How this millwork calculator works

Running feet of base, casing and crown, with the stick count you actually order from. Mitres eat the offcuts, which is what the waste allowance is for.

The formula

length to buy = run length × (1 + waste) · sticks = ⌈order ÷ stock length⌉

Assumptions and defaults

Default waste10%
Stock lengths12, 14 or 16 ft
Nailsone box per 16 ft of run
Caulkone tube per 120 ft

Pro tips

Ten per cent covers a normal house. Fifteen if the rooms are small — every room is four corners' worth of offcuts regardless of how short the walls are.

Buy the longest sticks that fit your longest wall. A scarf joint in the middle of a run is always visible once the light is right.

MDF for paint, poplar or pine where it takes a nail near an edge. MDF crumbles if you nail it too close.

Common questions

How much baseboard do I need?

Add up the perimeter of every room, subtract door openings, and add ten per cent. The calculator turns that into stick count for your stock length.

What length trim should I buy?

Sixteen foot if you can carry and store it — fewer joints. Twelve is easier to handle in a finished house and less likely to get damaged.

MDF or wood baseboard?

MDF if it is getting painted and staying dry. Real wood in bathrooms, basements and anywhere it might take a knock or a splash.

How much caulk for trim?

About a tube per 120 linear feet, more if you are caulking both the top edge and the mitres. Buy more than you think — it is the cheapest part of the job.

Related tools