Painting quote example: what a good one looks like

A real painting quote, line by line — coats, prep hours, allowances, and the exclusions that matter.

Jun 9, 2026·6 min read·The MeloDocs team

Interior repaint, three bedrooms and a hallway, walls and ceilings, trim and six doors. Occupied house, furniture moved to the middle and covered. Here is the quote, and then why each line is priced the way it is.

The line items

ITEMQTYRATETOTAL
Surface prep — patch, caulk, sand6 hr65.00390.00
Walls — two coats1,180 sq ft1.151,357.00
Ceilings — one coat430 sq ft0.95408.50
Trim and doors — two coats210 lf2.40504.00
Paint and sundries allowance9 gal58.00522.00
Subtotal3,181.50

Five lines. A painting quote with twenty lines on it is not more thorough, it is harder to say yes to.

Prep is hours, not square feet

This is the line that separates estimators who make money from estimators who do not. Coverage scales with area; prep does not. A smooth new wall and a wall with forty nail holes, a skim patch and failing caulk are the same square footage and four hours apart.

Price prep in hours, state the hours on the document, and describe what they cover. Then the client understands why the identical-looking quote from the guy who did not open a single closet door is $400 cheaper.

Say how many coats, every time

“Paint the bedrooms” is not a scope. Two coats over an existing similar colour is a different job from two coats over dark red, which is really three. Write the number of coats on every surface line, and write what happens if coverage needs another one.

Half the disputes in painting are about coats and the other half are about what “prep” meant. Both are solved in the document, before anyone opens a can.

Allowance versus included

The materials line above is an allowance: nine gallons at $58. If the client picks a designer line at $92 a gallon, the allowance covers $522 of it and the difference is a change order. Say that on the document in one sentence.

The alternative — folding an unnamed materials cushion into your wall rate — works until the client asks what paint you are using, and then you are explaining your pricing rather than your work.

The exclusions that actually matter in painting

INCLUDED
Moving and covering furniture in the work areaPatching nail holes and minor drywall dingsTwo coats on walls, one on ceilingsDaily cleanup and final wipe-down
EXCLUDED
Lead paint testing or abatementWallpaper removalDrywall repair beyond minor patchingCloset interiors unless listed

Lead is the one to never leave off on anything built before 1978 — it is a legal question before it is a pricing one. Closet interiors are the one that costs you a day every time you forget it.

Stop copying templates. Describe the job instead.

Try MeloDocs on a real job right now — or get one useful thing in your inbox every other Tuesday.

TRY THE TOOL
Write a quote in two minutes
No account, no card. Your first document exports to PDF.
Try it free →
EVERY OTHER TUESDAY
One useful thing, twice a month
A pricing idea, a scope clause, or a document you can copy.